|
The
statutory EIA studies include:
*************************************************
1. Proposed Comprehensive Development At Wing Kei Tsuen, Yuen Long, N.T. (EIA Study Brief no.ESB-240/2011)
(Planet Universal Limited and Infinity View Limited)
2. Proposed Comprehensive Development At Lin Barn Tsuen, Yuen Long, N.T. (EIA Study Brief no.ESB-239/2011)
(Birkenhead Properties and Investments Limited)
3. Development of Lok Ma Chau Loop (EIA Study Brief no.ESB-238/2011)
(Civil Engineering and Development Department)
4. West Kowloon Cultural District (EIA Study Brief no. ESB-237/2011)
(West Kowloon Cultural District Authority)
5. Proposed Road Improvement Works in West Kowloon Reclamation Development Phase 1 (EIA Study Brief no.ESB-236/2011)
(Highways Department)
6. Modernisation of East Wing of Tsuen Wan Water Treatment Works (EIA Study Brief no. ESB-235/2011)
(Water Supplies Department)
7. Proposed Comprehensive Development with Wetland Enhancement (CDWE) at Nam Sang Wai and Lut Chau(EIA Study Brief no. ESB-234/2011)
(Nam Sang Wai Development Company Limited, Kleener Investment Limited, Community Wetland Park Foundation Limited and Lut Chau Nature Reserve Foundation Limited)
8. Planning and Engineering Study on Future Land Use at Ex-Lamma Quarry Area at Sok Kwu Wan, Lamma Island — Feasibility Study (EIA Study Brief no. ESB-232/2011)
(Civil Engineering and Development Department)
9. EMSD Hong Kong Workshop at Sheung On Street, Chai Wan (EIA Study Brief no. ESB-231/2011)
(EMSD)
10. Proposed Residential Development East of Ping Kong, Sheung Shui, N. T. (EIA Study Brief no. ESB-230/2011)
(Join Crown Development Ltd.)
11. The Baroque on Lamma (EIA Study Brief no. ESB-229/2011)
(The Baroque on Lamma Limited)
12. Slip Roads from Tsing Tsuen Road to Tsuen Wan Raod, and from Ma Tau Pa Road/Wing Shun Street to Tsuen Wan Bypass (EIA Study Brief no. ESB-228/2011)
(Civil Engineering and Development Department)
13. Drainage Improvement Works at Ngong Ping (EIA Study Brief no. ESB-227/2011)
(Drainage Services Department)
14. Development of Organic Waste Treatment Facilities, Phase 2 (EIA Study Brief no. ESB-226/2011)
(Environmental Protection Department)
15. Harvest Fatty Acid Methyl Ester and Edible Oil Plant Development at Yuen Long Industrial Estate (EIA Study Brief no. ESB-225/2011)
(Harvest Investment Holdings Limited)
16. Cycle Track between Tsuen Wan and Tuen Mun — Stage 1 (Section from Tsuen Wan West to Ting Kau) (EIA Study Brief no. ESB-224/2011)
(Civil Engineering and Development Department)
17. Yung Shue Wan Development, Engineering Works, Phase 2 (EIA Study Brief no. ESB-223/2011)
(Civil Engineering and Development Department)
18. Kai Tak Development — Roads D3A & D4A (EIA Study Brief no. ESB-222/2011)
(Civil Engineering and Development Department)
19. Hung Shui Kiu New Development Area (EIA Study Brief no. ESB-221/2011)
(Civil Engineering and Development Department)
20. In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works - Design and Construction (EIA Study Brief no. ESB-220/2011)
(Water Supplies Department)
21. Tuen Mun Western Bypass (EIA Study Brief no. ESB-219/2011)
(Highways Department)
22. Modification of Hing Wah Street between Lai Chi Kok Road and Cheung Sha Wan Road for Two-Way Traffic (EIA Study Brief no. ESB-218/2010)
(Highways Department)
23. Harvest Biodiesel Plant Development (EIA Study Brief no. ESB-217/2010)
(Harvest Investment Holdings Limited)
24. Drainage Improvement in Northern New Territories — Package C (Remaining Works) (EIA Study Brief no. ESB-216/2010)
(Drainage Services Department)
25. Decommissioning, Reprovisioning, Construction and Operation of Affected Oil Depots at Southwest Tsing Yi Disposal (EIA Study Brief no. ESB-214/2010)
(Civil Engineering and Development Department)
26. Outlying Islands Sewerage Stage 2 — Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities (Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities) (EIA Study Brief no. ESB-212/2009)
(Drainage Services Department)
27. Outlying Islands Sewerage Stage 2 — Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities (Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities) (EIA Study Brief no. ESB-211/2009)
(Drainage Services Department)
28. Proposed Low-rise and Low-density Residential Development at Various Lots and their Adjoining Government Land in D.D. 104, East of Kam Pok Road, Mai Po, Yuen Long. New Territories (EIA Study Brief no. ESB-210/2009)
(Glory Queen Limited)
29. Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works (EIA Study Brief no. ESB-209/2009)
(Drainage Services Department)
30. Proposed Residential Development within "Recreation" ("REC") Zone at Various Lots in DD 104, Yuen Long, N.T. (EIA Study Brief no. ESB-207/2009)
(Capital Chance Limited)
31. Pilot Project for Public - Private Partnership Conservation Scheme, Sha Lo Tung Valley, Tai Po (EIA Study Brief no. ESB-206/2009)
(Sha Lo Tung Development Company Limited)
32. Proposed Residential Development within "Residential (Group D)" Zone at Various Lots in DD 104, Yuen Long, N.T. (EIA Study Brief no. ESB-204/2009)
(Capital Chance Limited)
33. Trunk Road T2 (EIA Study Brief no. ESB-203/2009)
(Civil Engineering and Development Department)
34. Cross Bay Link, Tseung Kwan O (EIA Study Brief no. ESB-196/2008)
(Civil Engineering and Development Department)
35. Tseung Kwan O — Lam Tin Tunnel and Associated Works (EIA Study Brief no. ESB-195/2008)
(Civil Engineering and Development Department)
36. Container Terminal 10 Development at Southwest Tsing Yi (EIA Study Brief no. ESB-194/2008)
(Civil Engineering and Development Department)
37. Sediment Removal at Sha Tau Kok Fish Culture Zone, Boat Shelter and Approach Channel (EIA Study Brief no. ESB-186/2008)
(Civil Engineering and Development Department)
38. Comprehensive Development and Wetland Protection near Yau Mei San Tsuen (EIA Study Brief no. ESB-182/2008)
(Asia King Development Limited)
39. Construction of Cycle Track and the associated Supporting Facilities from Nai Chung to Sai Kung Town (EIA Study Brief no. ESB-180/2008)
(Civil Engineering and Development Department)
40. Construction of Cycle Tracks and the associated Supporting Facilities at Nam Sang Wai, Yuen Long (EIA Study Brief no. ESB-179/2008)
(Civil Engineering and Development Department)
41. North East New Territories New Development Areas (EIA Study Brief no. ESB-176/2007)
(Civil Engineering and Development Department)
42. Flyover at Junction of Che Kung Miu Road and Hung Mui Kuk Road (EIA Study Brief no. ESB-173/2007)
(Civil Engineering and Development Department)
43. Pyrolysis Plant at Yuen Long Industrial Estate (EIA Study Brief no. ESB-165/2007)
(Global Power and Energy Company Limited)
44. Central Kowloon Route (EIA Study Brief no. ESB-156/2006)
(Highways Department)
45. Widening of Gascoigne Road Flyover (EIA Study Brief no. ESB-155/2006)
(Highways Department)
46. Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas (EIA Study Brief no. ESB-128/2005)
(China Resources Petrochems (Group) Co. Ltd.)
47. Lantau Logistics Park Development (EIA Study Brief no. ESB-121/2004)
(Civil Engineering and Development Department)
48. San Tin Western Main Drainage Channel (EIA Study Brief no. ESB-079/2001)
(Drainage Services Department)
49. Western Harbour Submarine Gas Pipeline and Associated Stations (EIA Study Brief no. ESB-073/2001)
(The Hong Kong China Gas Company Limited)
50. Sai Kung Sewage Treatment Works, Phase II Upgrading (EIA Study Brief no. ESB-067/2001)
(Drainage Services Department)
51. Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau (EIA Study Brief no. ESB-051/2000)
(Civil Engineering and Development Department)
52. Proposed Shuen Wan Landfill Golf Course (EIA Study Brief no. SB-011/BC)
(Home Affairs Bureau)
53. Lau Fau Shan Development - Package 4 (EIA Study Brief no. SB-010/BC)
(Civil Engineering and Development Department)
Information related to the EIA Ordinance is also
available at the EIA Ordinance website at http://www.epd.gov.hk/eia.
End/Friday, April 13, 2012
|